Facilities/Advanced Patient Care
Layout and potential use of former advanced care areas for general surge. Aspects being evaluated for general surge capacity, not for original purposes.
Date: ____________ Location: _______________________ Team member: __________________________
Operating Rooms
Observations:
|
General Condition:
|
Description of Structural Components
Floors: | |
Ceilings: | |
Windows: | |
Doors: | |
Missing, Damaged Structural Components (Note Location): |
Pests/Mold
Description and location:
|
Communications
Nurse call system? | |
Other? | |
Telemetry system? |
Lighting
Regular: | |
Emergency: |
HVAC and Air Flow (ducts, vents, and radiators)
General condition: |
Air Flow:
Y | N | Sinks? |
Y | N | Floor drains? |
Fire Suppression:
Y | N | Sprinkler heads? |
Y | N | Extinguishers? |
Waste Management and Hazardous Materials:
Y | N | Containment and storage capability? |
Y | N | On-site treatment/management set-ups? |
Hazardous Materials Management (storage, use):
Y | N | Segregated hazardous wastes storage? |
Y | N | Shielded radioactives storage? |
Y | N | Eye washes, drench showers? |
Y | N | Flammables cabinets? |
Y | N | Compressed gases chains? |